BUILDING THE EDUCATION REVOLUTION - ROUND 3, AUSTRALIA | 2009 - PRESENT
Project Management for design of new school building projects under the BER (total value $10 million). Buildings include new libraries, new multi-purpose halls, new sports halls, modifications to existing halls. Engagement of Architects and other consultants for design. Preparation of ....
|
| |
|
|
 |
|
FEDERAL STATE SCHOOL RELOCATION, AUSTRALIA | 2009 - PRESENT
Project Management for relocation of Federal state School (Project value A$12 million). Undertake all project management duties including design management for traditional delivery, engagement of specialist consultants for Cost Planning, Town Planning, traffic, geotechnical, sewerage treatment....

|
| |
|
|
 |
|
STRETTON STATE COLLEGE, AUSTRALIA | 2009 - PRESENT
Project Management for stage 3 of Stretton State College. Scope includes new teaching block, new staff room and air-conditioning to existing library. (Project value A$5.5 million). Undertake all project management duties including design management for D&C delivery, engagement ....

|
| |
|
|
 |
|
AUSTRALIAN EMBASSY, LAOS | 2006 - PRESENT
The works briefly described comprises the construction of a new high quality Chancery building for the Australian High commission in Vientiane, Laos. The works generally comprise a three level reinforced concrete structure with concrete external walls and steel framed roof with profiled sheet metal roof covering. The works include....

|
| |
|
|
 |
|
AUSTRALIAN CHANCERY, BANGLADESH | 2006 - PRESENT
Provision of major security upgrade to the Australian High commission chancery Building and Residents boundary fences. The scope of works include a blast resilience upgrade of the existing façade to the Chancery Building. The Façade hardening will comprise thick tempered glazing in new window frames with....

|
| |
|
|
 |
|
MINISTRY OF HEALTH, TONGA | 2002 - 2007
Management of the Design and Construction of a new annex to the Tonga Main Public Hospital to accommodate the Ministry of Health administration staff. The building comprises a two-storey, 550 square metre structure with a fifty-year design life, designed to resist the forces of earthquakes and ....

|
| |
|
|
 |
|
UNIVERSITY OF THE SOUTH PACIFIC, WESTERN SAMOA | 1994 - 1996
The current programme of building works as requested by The University of the South Pacific in its funding submission to AusAID includes the design documentation and construction of a Resource Centre (Library and Printery), Science and Teaching buildings, Student/ Staff Dining and associated infrastructure works.

|